- Contact Person : Mr. Wang Kunming
- Company Name : Weifang Wanbao Waterproof Materials Co., Ltd.
- Tel : 86-536-5513158
- Fax : 86-536-5513228
- Address : Shandong,weifang,Taitou Industry Park,Shouguang (Nanyangtou village)
- Country/Region : China
- Zip : 262735
SBS/APP Modified Bitumen Waterproofing Sheet
SBS Technical data Confirming to ISO9001.2008 | |||||||
No. | Item | I | II | ||||
PY | G | PY | G | ||||
1 | Soluble content/(g/m2)≥ | 3mm | 2100 | ||||
4mm | 2900 | ||||||
Test | No flame | No flame | |||||
2 | Heat Resistance | °C | 90 | 105 | |||
≤mm | 2 | ||||||
Test | no flow no dripping | ||||||
3 | Low temperature flexibility/°C | -20 | -25 | ||||
no crack | |||||||
4 | Impermeability 30minutes | 0.3Mpa | 0.2MPa | 0.3MPa | |||
5 | Tension | Maximum/(N/50mm) | 500 | 350 | 800 | 500 | |
Secondly-Maximum | |||||||
Test | no crack no apart | ||||||
6 | Elongation | Secondly-Maximum≥ | 30 | 40 | |||
Secondly-Maximum≥ | |||||||
7 | Oil Leaking | Pieces≤ | 2 |
Product specification
1.The yearly output : five million square meters ,
2.Good waterproofing and ageing-resistance function,not flowing at highest temperature and no crack at lowest temperature,
3.High tensile strength,
4.Anti-broker,anti-puncture,anti-resistance,anti-erosion,anti-mildew,anti-weathering
Applicable scope
Suitable for civil building roofing, underground, bridge, parking, pool, tunnel in the line of waterproofing and dampproof, especially for the building under high temperature. According the roofing engineering stipulation, APP modified bitumen membrane could be used in the Grade I civil building and industrial building which has special waterproofing requirement
Installation Sketch point
1)Clean the substrate using broom or high pressure dusty cleaner.
2)Apply primer
3)Heat the membrane bottom using a high temperature flame gun.
4)Push forward while the primer and membrane oil melted
5)Use a roller to push hard the membrane surface to ensure it stick firmly
Application method
1.Make sure the roof deck smooth ,clean and dry(Moisture<9%),then apply the surface of roof deck homogeneously with a kind bitumen paint till dry to start application.
2.There are two methods in application:
One way is by heating and melting method---Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing),then install the membrane fully bonded to the roof deck with overlaps of 5-10cm.
The other way is by cold adhesive method---Pour the cold adhesive homogeneously on the roof deck then roll the membrane to install it to be fully sticked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested.
3.After application ,a full serious inspection is required to make sure no air bubble ,no fold,no falling away etc to guarantee the waterproof life.
SBS/APP Modified Bitumen Waterproofing Sheet